KOPA
OLYMPIA motorway program involves the financing, construction and repair, as well as the operation over 30 years, of 365 Km of toll motorways linking Athens to Tsakona in the south-west of the Peloponnese, via Corinth and Patras. Of the total, 82 Km already exist, 120 Km need to be renovated and widened, and 163 Km of new motorway will be built over a period of six years. They include the construction of 19 Km of tunnels and more than 400 works of art (to be made from scratch or renovated) as well as twenty interchanges. The work is carried out by a consortium consisting, in particular, of Vinci, Hochtief, J&P-Avax, Aktor, and Gek-Terna.
Race has engaged in the Korinthos-Patra segment of the Olympia program by designing preliminary designs in a total length of 120km, and detailed designs in a total length of 86km.